top of page

Forum Comments

Mileage problem
In ZOE Z.E.50/E-Tech 2019-Present
Mileage problem
In ZOE Z.E.50/E-Tech 2019-Present
Pod point charging issue
In ZOE Z.E.40 2016-2019
May 12, 2022
I tried the 22kW at Tesco Swaffham ( PE37 7HS ) that started then stopped after 1 min the same with 7kW There.( Message Left on Plugshare ) Tesco 22kW at Sleaford when i tried worked for 10 - 15 mins then stopped same again with the 7kW. ( Message Left on Plugshare ) Podpoint 22kW at the Travelodge in York near the town centre is the same. So far thats the 22kW Podpoint ones i know won't work with my zoe so far. While on holiday for a few days Ago in Norfolk I called in at Gridserve Norwich to look around and while there charge on a AC 22 socket , but my Zoe tripped something and killed the power to the 22kw stand a lone post I was on and locked the cable in. I had to wait until the next-day to get my type 2 cable back , Luckily Gridserve had a 22kW type 2 cable to lend me while the electrician could come out to fix the fault. While there a ampere drivers charge stopped when another driver who was sharing AC post with him unplugged to leave but did not kill the power or lock the cable in. Plus the day before I arrived another 13 plate Zoe also killed the power and got his AC cable stuck. That to me is down to the poor earth install of the charge point. I have used the Gridserve 22kW stand a lone post at Doncaster North and IKEA Sheffield without a problem. In Doncaster a free 22kW inthe market place works every time but another which is the same make only works after its had a lot of Rain over a few days, If its dry it won't work. Top :Message Left on Plugshare about 22kW at Sleaford last year 2021 Bottom : message about the 22kW at Swaffham this year 2022
Content media
0
!
Widget Didn’t Load
Check your internet and refresh this page.
If that doesn’t work, contact us.
bottom of page